Dynamic scheduling grid computing
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
shouib
Active In SP
**

Posts: 6
Joined: Mar 2010
#1
02-04-2010, 09:07 PM


please provide me the ppt's ,report and code of dynamic scheduling in grid computing,,
shouib
Reply
reports-crawler
Active In SP
**

Posts: 291
Joined: Apr 2010
#2
04-04-2010, 08:05 PM

Distributed Dynamic Scheduling of Composite Tasks on Grid Computing Systems
A Grid is a computing and data handling virtual system
formed by aggregating the diverse services provided by the
distributed resources.The emergence of a variety of new
applications demand that the Grids support efficient data
and resource management mechanisms.several issues including
fault-tolerance and stability must be addressed by the resource management system (RMS). the wide-area scheduling problem is examined in this paper. a large hierarchical graph is used to model the internet topology. A task is modeled as a directed acyclic
graph (DAG).

Assumptions and Problem Statement:
It is assumed that that the resources are connected via a twolevel
hierarchical network. The first level is a wide-area
network (WAN) that connects local area networks (LANs)
at the second-level.the load is shared by the computing nodes in the LAN.

Two-Phase Distributed Scheduling Algorithm:
The distributed scheduling algorithm presented has two
phases: external and internal scheduling.The internal phase is implemented by
a LAN-wide, subtask-level, and centralized scheduler. Internal scheduler is fully aware of the subtasks,
however, has no knowledge of other LANs. The following tasks are performed by internal scheduler:
1)receives tasks from external scheduler for execution,
2)replies to bid requests from the external scheduler
3)allocates resources for the different subtasks of a task,
4)sends task execution results back to the external scheduler.
5)gathers execution results of subtasks
The external phase is implemented by a WAN-wide, task-level, and distributed scheduler

For more details on this topic, refer this pdf:


Attached Files
.pdf   Distributed Dynamic Scheduling of Composite Tasks.pdf (Size: 98.66 KB / Downloads: 65)
Use Search at http://topicideas.net/search.php wisely To Get Information About Project Topic and Seminar ideas with report/source code along pdf and ppt presenaion
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page

Quick Reply
Message
Type your reply to this message here.


Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  detect power grid synchronisation failure out of range frequency or voltage pdf Guest 1 61 31-10-2016, 03:20 PM
Last Post: jaseela123
  seminar reports on grid connected pv systems Guest 1 53 31-10-2016, 10:06 AM
Last Post: anusree
  mobile computing architecture ppt by rajkamal Guest 1 52 31-10-2016, 09:13 AM
Last Post: ijasti
  seminar report pervasive computing pdf Guest 1 47 29-10-2016, 03:07 PM
Last Post: Dhanabhagya
  opengl projects working of os algorithms for job scheduling fcfs Guest 1 61 11-10-2016, 03:33 PM
Last Post: amrutha735
  nanotubes to improve power grid efficiency ppt Guest 1 56 11-10-2016, 03:11 PM
Last Post: amrutha735
  data leakage detection using cloud computing ppt Guest 1 46 11-10-2016, 09:10 AM
Last Post: amrutha735
  advantage and disadvantage of soft computing ppt Guest 1 87 08-10-2016, 03:38 PM
Last Post: amrutha735
  opengl projects working of os algorithms for job scheduling fcfs Guest 1 55 08-10-2016, 02:37 PM
Last Post: amrutha735
  advantages and disadvantages of fog computing Guest 1 110 08-10-2016, 11:41 AM
Last Post: amrutha735