railway gate controlling & track switching
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
nirav_77patel@yahoo.in
Active In SP
**

Posts: 2
Joined: Sep 2010
#1
15-09-2010, 12:26 AM


hi,i am nirav patel.
i want some information about railway gate controlling & track switching.i also want ppt for this topic.i know how gate contol works.i dont know how track switching work.i dont know for available components of this topic.
i have abstract of this topic.
At present scenario, in level crossings, the railway gate is operated normally by a gate keeper after receiving the information about the train's arrival. When a train starts to leave a station, station master of the particular station delivers the information to the near by gate. The above said procedures are followed for operating the railway gates.
Semiautomatic railway gate operation is also followed in certain areas. Signals are located
in the vicinity of the railway gate along with gate master board and a marker light. Our paper
deals with automatic railway gate control (i.e.) gate operated with out gate keepers. It is
implemented in unmanned level crossings at remote areas.
SCHEMATIC DIAGRAM:

.The arrival of the train to reach the level crossing is sensed by the sensor R1/R2 placed on
either side of the gate at about 5 km from the level crossing. So the arrival is sensed by the
either side of the sensor and then the sensed signal is sent to the microcontroller.
First we are calculating the velocity of the train by using IR sensor fixed in particular
distance. Two set of IR sensors are placed before the gate. When the first set of IR sensor is
interrupted we have to start the times and second set of IR sensor is interrupted we have to stop the times.




IR SENSING CKT:



Infra red transmitter sensor gives the infra red rays, this wavelength depends upon the
input frequency of the sensor. If frequency is high, wavelength is high .IR receiver sensor
resistance depends upon the receiving IR signal. if receiver receives signal from transmitter,
the resistance of the resistor will be low .If receiver does not get signal from the transmitter,
its resistance will be high .so we get some voltage drop across the receiver depends on the
resistance of the receiver.
Reply
project report helper
Active In SP
**

Posts: 2,270
Joined: Sep 2010
#2
20-09-2010, 04:22 PM

More Info About railway gate controlling & track switching


topicideashow-to-automatic-railway-gate-control-and-track-switching-full-report
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page

Quick Reply
Message
Type your reply to this message here.


Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  BRAIN GATE TECHNOLOGY simbilypv 12 8,459 01-04-2016, 11:19 AM
Last Post: mkaasees
Wink Solar powered railway gate controller... Guest 1 923 21-09-2013, 02:49 AM
Last Post: Guest
  Intelligent unmanned railway level crossing. Guest 0 500 24-04-2013, 03:23 PM
Last Post: Guest
  AUTOMATIC WATER TAP CONTROLLING SYSTEM ajarun.raj 1 595 05-03-2013, 09:50 AM
Last Post: seminar tips
  electric power generation using railway track electrichari 2 2,056 02-03-2013, 04:59 PM
Last Post: Guest
Smile automatic number plate recognition with automatic gate control jvgkukkuz 0 432 22-01-2013, 12:35 PM
Last Post: jvgkukkuz
  TRACK MY ORDER Guest 0 313 07-12-2012, 11:55 AM
Last Post: Guest
  Automatic railway gate control and track switching. Guest 5 2,603 26-11-2012, 11:18 AM
Last Post: seminar tips
  ELECTRONIC SECURITY SYSTEM FOR RAILWAY COMPARTMENT GRGE 13 9,589 24-11-2012, 11:02 AM
Last Post: seminar tips
  ppt on online railway reservation project and implimentation Guest 2 1,011 11-10-2012, 11:20 AM
Last Post: seminar tips