runway resurfacing
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
rithinroy
Active In SP
**

Posts: 2
Joined: Jun 2010
#1
18-06-2010, 01:22 AM


give me a detailed seminar and presentation report on runway resrfacing
Reply
computer science topics
Active In SP
**

Posts: 610
Joined: Jun 2010
#2
18-06-2010, 04:12 PM

Runway Resurfacing And Repair Using Modern Materials & Techniques

Introduction
Repair and resurfacing of runway is a complex activity, which requires comprehensive engineering evaluation, selection of suitable materials commensurate to problems and proper co-ordination of construction procedure, and activities. It also demands setting up adequate quality planes and quality assurance methods .For runway resurfacing it is required to determine the nature and extent of deterioration and also the causes of deterioration. For this it is essential to carryout detailed study including overall project and implimentationion evaluation so as to evolve suitable repair alternatives.so this paper is to make an attempt to bring out certain salient features of planning and execution of Runway Resurfacing work based on a case study
Use Search at http://topicideas.net/search.php wisely To Get Information About Project Topic and Seminar ideas with report/source code along pdf and ppt presenaion
Reply
seminars on demand
Active In SP
**

Posts: 201
Joined: Jun 2010
#3
19-06-2010, 07:35 PM

Airport Runway Resurfacing Project
a major project and implimentation is carried out to resurface and
rehabilitate its main runway in the edinborough airport. This is done for renewing the life of the runway for at least 10 years. Some homes nearby will experience aircraft noise due to the change of timings due to aircport resurfacing. This increase in traffic has placed greater pressure on the main runway and
combined with its age, has left the runway requiring increasing amounts of
maintenance.resurface the runway is done to ensure that the airport can be continue to be used in the future. But the main airport runway is entirely safe to use and regular inspections are done on the runway. the main runway is also closed for ten days in the
spring and ten days in the autumn to carry out maintenance.

The resurfacing will be a massive project and implimentation,
costing £16 million and will will renew the lifespan of the runway for at least another ten years. It will take 150 workers and over 130,000 man hours. 25,000 tonnes of asphalt will be required and a little over 1,000 runway lights will be replaced.When the when resurfacing is being
undertaken, the runway will be closed to all aircraft movements. The project and implimentation will last for approximately eight months.

.pdf   Runway resurfacing factsheet.pdf (Size: 703.66 KB / Downloads: 157)
Use Search at http://topicideas.net/search.php wisely To Get Information About Project Topic and Seminar ideas with report/source code along pdf and ppt presenaion
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page

Quick Reply
Message
Type your reply to this message here.


Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  resurfaceing and repair of runway using modern technique Anil Naik 0 78 25-12-2015, 02:10 AM
Last Post: Anil Naik
  seminar on runway resurfacing and repair using modern materials and techniques ppt Guest 0 135 24-12-2015, 08:14 PM
Last Post: Guest